Kimchi

Checklists

Opening, closing, and the audit.

The daily checks that put the standard into the shift, with proof they got done.

A screen from Kimchi, standing in until this page has a shot of its own.

01

In the shift, on the floor

Done on a phone where the work happens, not signed off after.

02

Tied to the procedure

Each line points back at the standard it is checking.

03

Proof, not assurances

Timestamps and photos rather than a tick from memory.

04

Build the list

From the procedures that already exist.

05

It appears on the shift

The right list, at the right site, at the right time.

06

See what was missed

Gaps surface while they still matter.